Context: The Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, described as the most challenging post-independence railway project in India, involves tunnelling through the young Himalayas. Of the total 272 km, 161 km has been commissioned. The Katra-Banihal section, with 87% in tunnels, includes the longest transportation railway tunnel.
Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project
oDeclared as a "National Project" in 2002.
oThe iconic Chenab Bridge, with an overall length of 1315 m, an arch span of 467 m, and a height of 359 m above the Chenab river bed, will be the world's highest railway bridge.
Join 40,000+ UPSC Aspirants! 🚀
Get Free UPSC/State PSC Study Materials, Daily Current Affairs Question & Exam Updates.
Join Telegram Channel